| Objective(s) | i. To enhance the capacity of existing 132/33 kV substation; ii. To increase reliability of power supply at Dhaka area and |
| Scope of Work | 1. Ashuganj-Bhulta 400kV double circuit line: 69.00 km 2. LILO of Haripur-Rampura 230kV double circuit line at Bhulta Substation: 3.414 km 3. LILO of Ghorashal-Rampura 230kV double circuit line at Bhulta Substation: 1.10 km 4. Bhulta 400/230 kV 2x520 MVA AIS Substation |
| Project Cost | Total: 107970.46 Lakh BDT, GoB: 14692.33 Lakh BDT, Project Aid: 77468.33 Lakh BDT, PGCB: 15809.80 Lakh BDT |
| Development Partner | N/A |
| Duration | July, 2014 to December, 2019 |