Objective(s) | i. To enhance the capacity of existing 132/33 kV substation; ii. To increase reliability of power supply at Dhaka area and iii. Renovation /Up-gradation of some existing transmission lines. |
Scope of Work | 1. 132 kV double circuit line : 40 km 2. 132 kV single circuit line on double circuit tower : 60 km 3. 230 kV double circuit In-Out Line at proposed 230/132/33 kV Substation : 1 km 4. Four circuit Interconnecting 132kV line with existing line to connect proposed 230/132/33 kV Substation : 3.5 km 5. 132 kV Double Circuit In-Out Line at proposed 132/33 kV Substation : 2 km 6. Existing 132 kV Four Circuit Line Re-routing at new 230/132 kV Substation : 2 km 7. 230/132/33 kV Substation with 3x300 MVA transformer and 2x75 MVA transformers 8. 132/33 kV substation with 2×75 MVA transformer 9. 132/33 kV substation with 2×41 MVA transformer: 3 nos. 10. 132/33 kV substation with 2×75 MVA transformer 11. 2x75 MVA 3 phase power transformer at 132/33 kV Substation: 5 nos. 12. Re-conductoring of 132 kV double circuit line : 229 km 13. 132 kV single circuit stringing of existing 132 kV line : 51 km 14. Bay Extension : 6 nos. |
Project Cost | Total: 107970.46 Lakh BDT, GoB: 14692.33 Lakh BDT, Project Aid: 77468.33 Lakh BDT, PGCB: 15809.80 Lakh BDT |
Development Partner | N/A |
Present Status | Physical : 100 %Financial :100 % |
Estimated Duration | July, 2014 to December, 2019 |
Project Office | Project Director: Engr. Kazi Istiaque Hasan, Superintending Engineer Address: 9th Floor, NLDC Complex, Aftabnagar, Merul Badda, Dhaka-1212 Mobile: +88-01714-099-363(PD) Telephone: 880-02- 9888970, 880-02-9850476. Fax: 880-02- 9888970 E-mail: pd-ab@pgcb.org.bd |