Objective(s) | i. To evacuate power to be generated from the 335 MW under construction Power Plant and other incoming Power Plants at Siddhirganj. ii. To meet the growing demand of South-east part of Dhaka city and to relieve the existing 132 kV lines of this area through the new 230 kV double circuit transmission line. iii. To minimize transmission loss. |
Scope of Work | 1) Siddhirganj 230/132 kV, 2x225 MVA AIS Substation. 2) 230/132 kV, 2X300 MVA GIS substation at Maniknagar including one 132 kV bay extension in the existing 132/33 kV outdoor substation. 3) Siddhirganj - Maniknagar 230 kV Double Circuit O/H Transmission Line and relocation of an existing 132 kV dead-end Tower of Haripur line 1 & 2 by installing a new 132 kV dead-end Tower and provide underground cable connections. |
Project Cost | Total: 300.8079 crore BDT, GOB: 52.0461 crore BDT, PGCB : 26.0502 crore BDT, PA : 27.98 m USD |
Development Partner | IDA (World Bank) |
Present Status | Physical: 100%, Financial: 100% |
Estimated Duration | August, 2009 to June, 2015 |
Project Office |