Objective(s) | • The main objective of the project is to create facilities to evacuate power from upcoming Matarbari 1200MW power station. • To establish a 400 kV transmission backbone line between Dhaka & Chittagong Area by constructing Meghnaghat-Madunaghat 400kV double circuit line. |
Scope of Work | a) Meghnaghat-Madunaghat 400 kV double circuit line : 214 km b) 230 kV double circuit transmission line between Existing Madunaghat and New Madunaghat Substation: 8 km c) 230 kV Transmission Line In-Line Out from Hathazari – Shikalbaha at New Madunaghat Substation: 5.5 km d) 400 kV AIS substation at Meghnaghat : 01 Nos (Total: 2x750 MVA) e) 400 kV GIS substation at Madunaghat: 01 Nos (3x750 MVA) f) 230 kV AIS switching Station at Meghnaghat g) 230 kV GIS switching Station at Madunaghat h) Up gradation of existing 132 kV substation to 230 kV voltage level at Madunaghat i) Installation of GIB and Shunt Reactor at Matarbari. |
Project Cost | Total: 4456749.38 Lakh BDT, GoB: 114757.80 Lakh BDT, Project Aid: 292818.80 Lakh BDT, PGCB: 49172.78 Lakh BDT |
Development Partner | JICA |
Present Status | Physical: 99.25 % Financial: 84.19 % |
Estimated Duration | July, 2016 to June, 2025 |
Project Office | Project Director: Md. Enamul Haque, Chief Engineer (Addl Charge) Address: NLDC Complex Bhaban, Aftabnagar, Merul Badda, Dhaka. Mobile: 01730333265 E-mail: pd.dcmpgsp@pgcb.gov.bd |