Objective(s) • To evacuate the power from the upcoming power plants at Ghorasal.
• Up gradation of 230KV transmission network at North-Eastern region of Dhaka.
• To meet the growing demands of greater Dhaka, Chittagong and Sylhet areas.
• Up gradation of existing 3 nos of 132KV sub-stations at Comilla (South), Modunaghat (Chittagong) and Manikganj.
Scope of Work a) 400 KV Ghorashal-Tongi Double Circuit transmission line: 28 km
b) 230 kV transmission line: 55.3 km (U/G:4.3km)
c) 132 kV transmission line: 173km
d) 230/132/33 kV substation:02 Nos, (2x300 MVA each )
e) 230/132 kV substation:02 Nos, (2x300 MVA each)
f) 230/132 kV switching station: 01 Nos
g) 132/33 kV S/S all over the country: 09 Nos (Total 1702MVA)
h) Bay extension 230kV: 6 Nos.,
i) Bay extension 132 kV: 4 Nos
j) 132/33 kV Substation up gradation: 03 Nos (Total 300MVA)
Project Cost Total: 302958.17 Lakh BDT, GoB: 44585.07 Lakh BDT, Project Aid: 195446.75 Lakh BDT, PGCB: 62926.35 Lakh BDT
Development Partner IDB, ADB
Present Status Physical: 94.72% Financial: 87.73 %
Estimated Duration July, 2013 to December, 2025
Project Office Project Director: Md. Farid Ahmmed , Chief Engineer
Address:NLDC Bhaban, Aftabnagar, PGCB, Dhaka-1212.
Mobile: 01777760418
E-mail: pd.400gndp@pgcb.gov.bd

last updated on: 2025-03-28 11:28:54
Information Source: Project Planning