Objective(s) | • To evacuate the power from the upcoming power plants at Ghorasal. • Up gradation of 230KV transmission network at North-Eastern region of Dhaka. • To meet the growing demands of greater Dhaka, Chittagong and Sylhet areas. • Up gradation of existing 3 nos of 132KV sub-stations at Comilla (South), Modunaghat (Chittagong) and Manikganj. |
Scope of Work | a) 400 KV Ghorashal-Tongi Double Circuit transmission line: 28 km b) 230 kV transmission line: 55.3 km (U/G:4.3km) c) 132 kV transmission line: 173km d) 230/132/33 kV substation:02 Nos, (2x300 MVA each ) e) 230/132 kV substation:02 Nos, (2x300 MVA each) f) 230/132 kV switching station: 01 Nos g) 132/33 kV S/S all over the country: 09 Nos (Total 1702MVA) h) Bay extension 230kV: 6 Nos., i) Bay extension 132 kV: 4 Nos j) 132/33 kV Substation up gradation: 03 Nos (Total 300MVA) |
Project Cost | Total: 302958.17 Lakh BDT, GoB: 44585.07 Lakh BDT, Project Aid: 195446.75 Lakh BDT, PGCB: 62926.35 Lakh BDT |
Development Partner | IDB, ADB |
Present Status | Physical: 94.72% Financial: 87.73 % |
Estimated Duration | July, 2013 to December, 2025 |
Project Office | Project Director: Md. Farid Ahmmed , Chief Engineer Address:NLDC Bhaban, Aftabnagar, PGCB, Dhaka-1212. Mobile: 01777760418 E-mail: pd.400gndp@pgcb.gov.bd |