Objective(s) | i)To establish a Grid Interconnection between Bangladesh & India for facilitating exchange of electricity as and when it is possible & feasible. ii) To meet up the ever increasing demand of electricity for socio economic development in both the countries. |
Scope of Work | 400 kV Line: 27.3 km Double Circuit 230 kV Line In/Out: 4.5 km Substation: 500 MW HVDC (Back-to Back) |
Project Cost | Total: 1579.83 crore BDT, GOB: 451.20 crore BDT, PGCB : 217.93 crore BDT, PA : 910.70 crore BDT |
Development Partner | ADB |
Present Status | Physical: 100%, Financial: 100% |
Estimated Duration | July, 2010 to June, 2014 |