Objective(s) To evacuate power from existing 50 MW and upcoming 100 MW power plants at Amnura and to meet the growing demand of Amnura area of Chapainawabganj district.
Scope of Work 1. 132 kV single circuit pole line (Most of the Poles will be provided from PGCB store), from Rajshahi-Chapainawabganj 132 kV line (T connection at 1 km away from Chapainawabganj substation) to Amunra substation on single circuit pole line : 15 km (Single Grossbeak)
2. 132/33 kV AIS substation,
Double Bus Scheme with 132/33 kV, 1 x 35/50 MVA 3-Phase transformer;
132 kV Line Bay: 4 nos.
132 kV Transformer Bay: 1 no.
132 kV Coupler Bay: 1 no.
33 kV Transformer Bay: 1 no.
Project Cost Total: BDT 9166.55 Lakh BDT; Local Currency (LC): BDT 4163.91 Lakh BDT; Foreign Currency (FC): BDT 5002.64 Lakh BDT
Development Partner -
Present Status Physical : 100%
Estimated Duration January, 2014 to December, 2019
Project Office Project Director: Bazlul Munir, Superintending Engineer
Address: House:06(2nd Floor), Road:23/A, Gulshan-1, Dhaka-1212.
Mobile: +88-01714-041-412 (PD)
Telephone: 02-9891402
Fax: 02-9892975
E-mail: pd-astlp@pgcb.org.bd, astlp@pgcb.org.bd

last updated on: 2020-12-30 05:55:39
Information Source: Project Planning