Objective(s) i. To improve power supply security, reliability and resiliency of the capital city Dhaka and its adjacent area
ii. Enhance the safety and security of the transmission system by eliminating the risk of accidents, such as electrocution or damage caused by severe weather conditions, tree falling etc.
iii. To minimize the socio-environmental impact of existing overhead transmission line infrastructure by reducing land and right of way (ROW) requirement
iv. To minimize the socio-environmental impact of existing overhead transmission line infrastructure by reducing land and right of way (ROW) requirement
Scope of Work 1. 230 kV underground cable
2. 132 kV underground cable
Project Cost Total Cost: 127824.27 lakh BDT
Development Partner -
Present Status PDPP has been sent to Planning Commission on 19/12/2023
Estimated Duration 01/07/2024 to 30/06/2028
Project Office

last updated on: 2024-01-03 16:02:32
Information Source: Project Planning