Objective(s) | • To increase reliability and efficiency of the electrical power supply in Bangladesh through expanding and improving the 230 kV and 132 kV power transmission system of PGCB |
Scope of Work | a) 230 kV Double Circuit Transmission Line: 82 km b) 132 kV Double Circuit Transmission Line: 95.1 km c) Renovation of Naogaon - Niamotpur 132 kV TL 2nd circuit stringing: 46 km d) Reconductoring of double circuit conductor in existing Rajbari-Barisal 132 kV D/C TL: 150 km e) 230/132 kV Sub-station : 05 Nos (Total 3300 MVA) f) New 132/33 kV Substation: 08 Nos(Total 1740 MVA) g) Renovation of 132/33 kV Substation:06 Nos (Total 1260 MVA) h) 132 kV bay extension at existing substations: 15 nos. i) Construction of Line in - Line out transmission line:16.725 km |
Project Cost | Total:294686.50 Lakh BDT GoB: 109796.03 Lakh BDT Project Aid: 137058.79 Lakh BDT PGCB: 47831.68 Lakh BDT |
Development Partner | KfW |
Present Status | Physical: 86.48 % Financial: 78.38 % |
Estimated Duration | January, 2017 to December, 2024 |
Project Office | Project Director: Md Sultan Alam, Chief Engineer (Addl Charge) Address: PGCB Head Office, Aftabnagar, Badda, Dhaka-1212 Mobile: 01755639575 E-mail: pd.eegbpsp@gmail.com |