Objective(s) | • To address some fundamental measures that must be put in place so that the power system can be operated in a secure and economic manner in line with the longer term goals to deliver much greater quantum of power. |
Scope of Work | a) Reconductoring of Barisal(N)-Barisal 132 kV Double Circuit line: 10km b) Reconductoring of Saidpur-Purbasadipur 132 kV Double Circuit line: 30 km c) Introduction of DLR (Dynamic Line Rating) for 400 km of most important transmission lines of PGCB. d) Integration of generators to the NLDC’s SCADA/EMS system, upgradation/modernization of the NLDC’s SCADA/EMS system to meet future needs. |
Project Cost | Total: 57995.20 Lakh BDT, GOB: 9249.84 Lakh BDT, PA: 43042.40 Lakh BDT, PGCB: 5702.96 Lakh BDT |
Development Partner | World Bank |
Present Status | Physical: 79.98 % Financial: 25.26 % |
Estimated Duration | July, 2017 to December, 2024 |
Project Office | Project Director : Mohammad Arifur Rahman , Superintending Engineer (Addl Charge) Project Office : PGCB Head Office, Aftabnagar, Dhaka-1212 Mobile : 01787680509 E-mail : pd.bpsreip@pgcb.gov.bd |