Objective(s) | i. To increase the power supply reliability of Mymensingh area. ii. To reduce dependency on Ashuganj-Kishorganj 132kV line. iii. To evacuate the Power from the upcoming Power Plant in Mymensingh area. iv. To meet the growing demand of Rangamati, Khagrachari, Beanibazar & Sunamganj. v. To supply reliable power to Hill Tract area. vi. To minimize the accumulation of huge power at Ashuganj 132 kV bus bar. vii. To minimize the overloading of existing Ashuganj-Ghorasal 132 kV transmission line viii. To strengthen the power evacuation arrangement & increase power supply stability, reliability & transmission capability in Ashuganj & Ghorasal area. |
Scope of Work | 1. 132 kV double circuit line : 237 km 2. 132 kV single circuit line : 58 km 3. 132/33 kV SS: 4 nos. 4. 132 kV Bay Extension: 17 nos. 5. 132 kV Bay Modification: 3 nos. 6. Conversion of Single Bus-bar configuration into Double Bus-bar at 132/33 kV S/S 7. Installation of one 132/33 kV 75 MVA transformer |
Project Cost | Total: BDT 98256.59 Lakh, GoB: BDT 17442.81 Lakh, Project Aid: BDT 68087.69 Lakh, PGCB: BDT 12726.09 Lakh. |
Development Partner | ADB |
Present Status | Physical : 100 %Financial : 100 % |
Estimated Duration | January, 2013 to December, 2018 |
Project Office | Project Director: Md. Shafiullah Address: NLDC Building (5th Floor), Aftabnagar, Rampura(Badda) Dhaka-1212, Mobile: +88-01730-029-317 E-mail: pd-gndp@pgcb.org.bd |